‹script> window.dataLayer = window.dataLayer || lJ; function gtag){dataLayer.pusharguments) ;) gtag('js', new Date()); gtag( 'config', 'G-2RGTY199R2');

PCU Wastewater Treatment Plant
and Collection System
Uhland, TX

PCU-WWTP-Composite-14x10

Southwest Engineers (SWE) designed a 20,000-gpd wastewater treatment plant and wastewater collection system consisting of over 8,000 LF of 12” and 15” gravity mains, a duplex lift station, and 4,800 LF of 8” force main. In 2021, we completed additional projects that significantly expanded this new wastewater system, including a 150,000-gpd wastewater treatment plant expansion, another 7,000 LF of gravity main, two additional lift stations, and over 11,000 LF of new force main.